Howe Drive 2012
Third and Final Phase
Wednesday, December 5, 2012
draining the water
enlarging the retention pond
installing the passage sets
putting the door stops in place
filling in the gaps
installing the heating ducts
installing the water lines
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment